Abstract
Parents will still be able to drive their children to summer camps but may need to take a detour, which will be clearly marked to minimize disruption. Workers with Catawba Asphalt Paving Co. Inc. of Rock Hill will cover the loop around the lake and the road around Winthrop Coliseum with asphalt.